March 2008
- No hydrogen sulfide readings were detected by any of the monitors.
- An estimated 2,008,800 cubic feet of landfill gas removed and treated in March.
- An estimated 3,150,029 gallons of contact water (water that has seeped through the landfill and
accumulated underneath the landfill) and well water were removed and treated in March.
- Water was discharged from the east permitted discharge point at the maximum capacity allowed by
permit (120 gallons per minute) throughout March.
|