Week ending March 11, 2006
The contact water treatment shows no changes with the two seep flows
at 15 gpm (gallons per minute) into the lower east pond with the same
treatment as needed.
The landfill gas collection and treatment system is nearly complete
with testing of the blower system to verify landfill gas delivery and to
adjust gas delivery mechanism to the burner. It is expected, the unit
will be up and running next week and will also have the housing unit
over the blower installed to reduce noise.
The air monitoring system installation is completed except for final
installation of the telemetry system and hook up of the alarm system
which is expected to be completed soon.
|